Get
Earned Value Management Examples

Life Cycle Cost Calculation View

Totals Analysis

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks components and operations.

Calculation View Description
Sample analysis used in an EVM tutorial. v214a

Version: 1.7.0

Feedback About commercial/componentgroup/Earned Value Management Examples/658/componentlcatotal1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Operations go into operating budgets. Components go into capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Earned Value Management Examples
Component Group
Earned Value Management Examples
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 6.001 mile 700,000.00 600,100.00 600,100.00 m01
EVM tutorial example.
Labor 12.002 mile 3,150,000.00 2,700,450.00 2,700,450.00 l01
EVM tutorial.
Equipment 6.001 mile 1,050,000.00 900,150.00 900,150.00 e01
EVM tutorial example.
Land 6.001 2,100,000.00 1,800,300.00 1,800,300.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 2700450.00 900150.00 2400400.00 6001000.00 6001000.00 0.00
Component
2013, Q1 RR Track Actual(Amount: 1.000; Date: 03/31/2013
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 0.667 mile 100,000.00 66,700.00 66,700.00 m01
EVM tutorial example.
Labor 1.334 mile 450,000.00 300,150.00 300,150.00 l01
EVM tutorial.
Equipment 0.667 mile 150,000.00 100,050.00 100,050.00 e01
EVM tutorial example.
Land 0.667 300,000.00 200,100.00 200,100.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 300150.00 100050.00 266800.00 667000.00 667000.00 0.00
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Input: 2013 RR Track Cap Bud
Materials 0.667 mile 100,000.00 66,700.00 66,700.00 m01
EVM tutorial example.
Labor 0.667 mile 250,000.00 166,750.00 166,750.00 l01
EVM tutorial example.
Equipment 0.667 mile 150,000.00 100,050.00 100,050.00 e01
EVM tutorial example.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 166,750.00 100,050.00 66,700.00 333,500.00 333,500.00 0.00
1.00 mile 333,500.00 0.00 0.00 0.00 A actual
Description : Sample analysis used in an EVM tutorial. v214a
Input: 2013 RR Track Site Prep Cap Bud
Land 0.667 300,000.00 200,100.00 200,100.00 re01
EVM tutorial.
Labor 0.667 mile 200,000.00 133,400.00 133,400.00 l01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 133,400.00 0.00 200,100.00 333,500.00 333,500.00 0.00
1.00 mile 333,500.00 0.00 0.00 0.00 A benchmark
Description : Sample analysis used in an EVM tutorial. v214a
Component
2013, Q1 RR Track Planned(Amount: 1.000; Date: 03/31/2013
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 2.000 mile 450,000.00 450,000.00 450,000.00 l01
EVM tutorial.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 450000.00 150000.00 400000.00 1000000.00 1000000.00 0.00
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Input: 2013 RR Track Cap Bud
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 1.000 mile 250,000.00 250,000.00 250,000.00 l01
EVM tutorial example.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 250,000.00 150,000.00 100,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A actual
Description : Sample analysis used in an EVM tutorial. v214a
Input: 2013 RR Track Site Prep Cap Bud
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Labor 1.000 mile 200,000.00 200,000.00 200,000.00 l01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 200,000.00 0.00 300,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A benchmark
Description : Sample analysis used in an EVM tutorial. v214a
Component
2013, Q2 RR Track Actual(Amount: 1.000; Date: 06/30/2013
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 0.667 mile 100,000.00 66,700.00 66,700.00 m01
EVM tutorial example.
Labor 1.334 mile 450,000.00 300,150.00 300,150.00 l01
EVM tutorial.
Equipment 0.667 mile 150,000.00 100,050.00 100,050.00 e01
EVM tutorial example.
Land 0.667 300,000.00 200,100.00 200,100.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 300150.00 100050.00 266800.00 667000.00 667000.00 0.00
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Input: 2013 RR Track Cap Bud
Materials 0.667 mile 100,000.00 66,700.00 66,700.00 m01
EVM tutorial example.
Labor 0.667 mile 250,000.00 166,750.00 166,750.00 l01
EVM tutorial example.
Equipment 0.667 mile 150,000.00 100,050.00 100,050.00 e01
EVM tutorial example.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 166,750.00 100,050.00 66,700.00 333,500.00 333,500.00 0.00
1.00 mile 333,500.00 0.00 0.00 0.00 A actual
Description : Sample analysis used in an EVM tutorial. v214a
Input: 2013 RR Track Site Prep Cap Bud
Land 0.667 300,000.00 200,100.00 200,100.00 re01
EVM tutorial.
Labor 0.667 mile 200,000.00 133,400.00 133,400.00 l01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 133,400.00 0.00 200,100.00 333,500.00 333,500.00 0.00
1.00 mile 333,500.00 0.00 0.00 0.00 A benchmark
Description : Sample analysis used in an EVM tutorial. v214a
Component
2013, Q2 RR Track Planned(Amount: 1.000; Date: 06/30/2013
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 2.000 mile 450,000.00 450,000.00 450,000.00 l01
EVM tutorial.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 450000.00 150000.00 400000.00 1000000.00 1000000.00 0.00
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Input: 2013 RR Track Cap Bud
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 1.000 mile 250,000.00 250,000.00 250,000.00 l01
EVM tutorial example.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 250,000.00 150,000.00 100,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A actual
Description : Sample analysis used in an EVM tutorial. v214a
Input: 2013 RR Track Site Prep Cap Bud
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Labor 1.000 mile 200,000.00 200,000.00 200,000.00 l01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 200,000.00 0.00 300,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A benchmark
Description : Sample analysis used in an EVM tutorial. v214a
Component
2013, Q3 RR Track Actual(Amount: 1.000; Date: 09/30/2013
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 0.667 mile 100,000.00 66,700.00 66,700.00 m01
EVM tutorial example.
Labor 1.334 mile 450,000.00 300,150.00 300,150.00 l01
EVM tutorial.
Equipment 0.667 mile 150,000.00 100,050.00 100,050.00 e01
EVM tutorial example.
Land 0.667 300,000.00 200,100.00 200,100.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 300150.00 100050.00 266800.00 667000.00 667000.00 0.00
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Input: 2013 RR Track Cap Bud
Materials 0.667 mile 100,000.00 66,700.00 66,700.00 m01
EVM tutorial example.
Labor 0.667 mile 250,000.00 166,750.00 166,750.00 l01
EVM tutorial example.
Equipment 0.667 mile 150,000.00 100,050.00 100,050.00 e01
EVM tutorial example.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 166,750.00 100,050.00 66,700.00 333,500.00 333,500.00 0.00
1.00 mile 333,500.00 0.00 0.00 0.00 A actual
Description : Sample analysis used in an EVM tutorial. v214a
Input: 2013 RR Track Site Prep Cap Bud
Land 0.667 300,000.00 200,100.00 200,100.00 re01
EVM tutorial.
Labor 0.667 mile 200,000.00 133,400.00 133,400.00 l01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 133,400.00 0.00 200,100.00 333,500.00 333,500.00 0.00
1.00 mile 333,500.00 0.00 0.00 0.00 A benchmark
Description : Sample analysis used in an EVM tutorial. v214a
Component
2013, Q3 RR Track Planned(Amount: 1.000; Date: 09/30/2013
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 2.000 mile 450,000.00 450,000.00 450,000.00 l01
EVM tutorial.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 450000.00 150000.00 400000.00 1000000.00 1000000.00 0.00
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Input: 2013 RR Track Cap Bud
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 1.000 mile 250,000.00 250,000.00 250,000.00 l01
EVM tutorial example.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 250,000.00 150,000.00 100,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A actual
Description : Sample analysis used in an EVM tutorial. v214a
Input: 2013 RR Track Site Prep Cap Bud
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Labor 1.000 mile 200,000.00 200,000.00 200,000.00 l01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 200,000.00 0.00 300,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A benchmark
Description : Sample analysis used in an EVM tutorial. v214a
Component
2013, Q4 RR Track Planned(Amount: 1.000; Date: 12/31/2013
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 2.000 mile 450,000.00 450,000.00 450,000.00 l01
EVM tutorial.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 450000.00 150000.00 400000.00 1000000.00 1000000.00 0.00
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Input: 2013 RR Track Cap Bud
Materials 1.000 mile 100,000.00 100,000.00 100,000.00 m01
EVM tutorial example.
Labor 1.000 mile 250,000.00 250,000.00 250,000.00 l01
EVM tutorial example.
Equipment 1.000 mile 150,000.00 150,000.00 150,000.00 e01
EVM tutorial example.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 250,000.00 150,000.00 100,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A actual
Description : Sample analysis used in an EVM tutorial. v214a
Input: 2013 RR Track Site Prep Cap Bud
Land 1.000 300,000.00 300,000.00 300,000.00 re01
EVM tutorial.
Labor 1.000 mile 200,000.00 200,000.00 200,000.00 l01
EVM tutorial.
Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Unit Amount Unit Total Unit Cost Service Life P/C Years Yrs From Base Date Altern Type Target Type
Totals 200,000.00 0.00 300,000.00 500,000.00 500,000.00 0.00
1.00 mile 500,000.00 0.00 0.00 0.00 A benchmark
Description : Sample analysis used in an EVM tutorial. v214a
Dataset: Earned Value Management Examples IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.